In Oil & Gas, every hour of non-productive time (NPT) is paid for twice: in production that is not sold and in costs that keep running. And a significant share of that NPT does not come from major accidents but from recurring problems: flange leaks, corroded pipes, valves that do not seal and equipment that deteriorates during shutdowns.
What NPT is
It is all the time during which an asset, a well or a line is not producing, or not progressing as planned, for unscheduled reasons. It includes waiting on repairs, isolations, permits, spare parts and rework.
The causes of NPT that can be prevented
| Cause | Typical effect | Preventive solution |
|---|---|---|
| Leaks in flanges and threads | Shutdowns, emissions, fire risk | Sealants and tightening procedures |
| Internal corrosion | Wall thickness loss, ruptures | Pigging, inhibitors, monitoring |
| External corrosion | Emergency repairs | Coatings and composite repair |
| Assets deteriorated in storage | Equipment that will not start | Preservation with VCI |
| Welded repairs | Hot work permits, depressurization | Cold-applied non-metallic repairs |
How to start reducing it
- Measure: record every NPT event with its cause, duration and cost.
- Prioritize: 20% of the causes usually explain most of the lost time.
- Prevent instead of react: move from repairing leaks to avoiding them.
- Standardize: tightening procedures, sealant selection and preservation.
- Have solutions ready: composite repair kits and sealants on hand reduce the wait.
The cost of not doing it
NACE’s IMPACT study estimated the global cost of corrosion at about US$2.5 trillion a year, equivalent to 3.4% of world GDP, and calculated that applying good control practices could save between 15% and 35%. Much of that cost in Oil & Gas shows up as NPT.
Total Care: the Royal Integrity model
Royal Integrity does not sell standalone products: its Asset Preservation Program combines recovery, preservation and sealing to drastically reduce corrosion-related cost overruns and NPT. It integrates Jet-Lube and Deacon sealants, Rocket Wrap and Seal Wrap repairs, iNPIPE pigging and Zerust – Excor VCI, with field and after-sales support.
Frequently asked questions
What does NPT mean? Non-Productive Time: time lost to unscheduled causes.
How is the cost of NPT calculated? Hours lost multiplied by the deferred production and the costs of equipment and personnel on standby.
What is the fastest way to reduce it? Tackling recurring causes, such as leaks and corrosion, with preventive solutions and spares on hand.
Want a diagnosis of your NPT causes? Schedule a technical consultation.